← HomepageAll repository proofValidation recordState of TS Architecture 2026
Repository proof
ice architecture
Changing packages/ice/src/utils/logger in ice reaches 51 modules. 27 files call it directly. Snapshot 2742ac4.
The first file to open in ice is packages/ice/src/utils/logger. A change there reaches 51 of 490 modules.
This lead file reaches 10% of the graph. The median published proof reaches 60%.
Median 60%. Thick bar is blast share. Thin bar is fan-in.
Project: ice · Score: 84/100 (Healthy architecture) · 490 modules · 828 edges · TypeScript · 34 of 94 · Language score median 80.1
- Cycles
- 37
- Duplicate authorities
- 56
- God modules
- 10
- Layer violations
- 4
arc impact packages/ice/src/utils/loggerUnder 3 minutes to first arc impact on a TypeScript monorepo (internal runs).
README badge
[](https://arcsight.ai/repositories/ice/)Blast radius paths
Ranked by blast radius. Fan-in is direct dependents. Blast radius is downstream modules reachable from that file.
ice · 2742ac4
| Rank | File | Fan-in | Blast | Share |
|---|---|---|---|---|
| 1 | packages/ concentrates too many responsibilities, shared utility hub, crosses a layer boundary | 27 | 51 | 10% |
| 2 | packages/ concentrates too many responsibilities, shared utility hub | 14 | 49 | 10% |
| 3 | packages/ | 8 | 49 | 10% |
| 4 | packages/ | 19 | 48 | 10% |
| 5 | packages/ | 14 | 48 | 10% |
All ranked files
| Rank | File | Fan-in | Blast | Share |
|---|---|---|---|---|
| 6 | packages/ | 13 | 48 | 10% |
Circular dependencies
This snapshot records 37 dependency cycles.
Nearby proofs
- Astro architecture 69/100 · 551 modules
- Qwik architecture 61.2/100 · 373 modules
- Svelte architecture 81.6/100 · 368 modules
Snapshot notes
In alibaba ice, a change that begins in utils logger keeps traveling until it reaches miniapp-runtime constants, with dom node_types as the third file on that walk and the src-typings group as the group around them, snapshot mark acbcbaaddd.
dom element is worth opening beside utils logger because miniapp-runtime interface still participates when dom element moves, and dom node stays in view for alibaba ice, snapshot mark acbcbaaddd.
Review bundler types only after miniapp-runtime constants and utils routeManifest are both on the table, since the link from types plugin back to dom node_types belongs to alibaba ice under snapshot mark acbcbaaddd.
utils ServerCompileTask and plugin-miniapp types are later stops, and a reviewer who has already seen utils logger should still look at utils types before treating the src-typings group as understood for alibaba ice, snapshot mark acbcbaaddd.
utils logger closes the file list after miniapp-runtime constants and dom node_types, which keeps the alibaba ice note tied to snapshot mark acbcbaaddd, and the files named in this paragraph are the ones the review is willing to stand on.
Subsystem overview
- src-typings (3 modules)
- service-ServerRunner (25 modules)
- types-plugin (42 modules)
- src-style (4 modules)
- utils-normalizePath (3 modules)
- src-reconciler (4 modules)
- dom-element (63 modules)
- src-types (3 modules)
- src-constants (3 modules)
- utils-normalizeLocalePath (10 modules)
- src-types (3 modules)
- src-intl-until (3 modules)
- helper-terminal (7 modules)
- utils-types (10 modules)
- ali-components (4 modules)
CLI workflow
Impact, then scan, fix, finish, and watch.
arc impact <file>See what a change breaksarc scanFind issuesarc fixApply fixesarc finishResolve remainingarc watchKeep clean
FAQ
- Which file should change first in alibaba ice: utils logger?
- Start with utils logger, because the rest of the alibaba ice walk leaves from that file and miniapp-runtime constants is the next file in the same review. Commit acbcbaaddd records it.
- What else is on the alibaba ice walk besides utils logger and dom node_types?
- dom node_types and dom element stay on the walk with miniapp-runtime interface, which are different files from utils logger inside the src-typings group for alibaba ice. Commit acbcbaaddd records it.
- How should a reviewer use dom node in the alibaba ice snapshot?
- Keep dom node, bundler types, and utils routeManifest open together, then check types plugin before merging the alibaba ice change. Commit acbcbaaddd records it.
- Where does the alibaba ice review stop after utils ServerCompileTask?
- Stop after utils ServerCompileTask, plugin-miniapp types, and utils types have been compared with utils logger, leaving the src-typings group until those alibaba ice files are clear. Commit acbcbaaddd records it.
Run ArcSight on your repo
Install locally, then run arc impact on the file you plan to change — before merge.
Embed this report
Use this iframe to show the architecture badge on your site.
<iframe src="https://arcsight.ai/embed/ice/" width="320" height="180" frameborder="0"></iframe>Explore
Evidence-backed analysis snapshot. snapshot.json · How ArcSight measures blast radius · Install · Homepage demo